Built for the infrastructure ahead.

Data center engineering takes 6 to 18 months. The workforce is shrinking. The playbook is obsolete. Aran exists to break that constraint.

340K
Unfilled engineering positions by EOY 2026
$177B
Lost to rework and delays annually
70%
Of projects experience design rework
See the difference
AranTraditional EPC
RFI volumeSignificantly reduced9.9 per $1M of value
RFI response timeHours~10 days average
Schedule delaysRe-generated in minutes40% of projects delayed
Scope changesRe-generatedRework cascade
Design optionsMultipleSingle path
DisciplinesAll integratedSiloed across firms
DeliverablePE-stampablePE-stampable

The world's ability to build has fallen behind its ability to dream. We're closing that gap.

Latest

Data Centers Have a Bottleneck That Isn't Chips

The U.S. construction industry loses $177 billion a year to rework and delays. Data centers are the fastest-growing segment.

Build with us

Engineers, builders, and technologists working on the hardest problems in physical infrastructure.

View open roles

Building data centers and need engineering done differently?

Contact